

Image status: Authorized project image available
Identified model
ZD-89 Drilling Tool
Model reference: ZD-89
Drilling Tool configuration based on the ZD-89 reference. Confirm operating conditions before final selection.
Overview
ZD-89 Drilling Tool (ZD-89) is an identified drilling-tool record intended for compatibility-led selection. A tool should not be selected from diameter or model reference alone: the hammer or rock drill interface, thread or shank, drill-pipe connection, formation, flushing method and operating pressure all affect suitability. The catalog fields shown for this record are limited to its captured evidence and do not create a compatibility, wear-life or performance guarantee. COWIN MACHINE can review the rig, hammer or rock drill, required hole size, connection details and drilling method before proposing a configuration. Configuration subject to application review. For the ZD-89 Drilling Tool record, the review should document the actual application, site interfaces and operating sequence before any configuration is confirmed. This overview explains general selection context only. Exact capability, limits, materials, test conditions and compatibility remain subject to the approved model record and application review.
Key Benefits
- Reduces the risk of incompatible tool interfaces
- Supports a documented drill-string review
- Connects the bit choice to the bore objective
- Encourages planned wear inspection and replacement
- Keeps material-grade claims behind verified documentation
How It Works
Drilling consumables transmit impact, rotation and flushing energy from a drilling system to the rock or formation. A DTH hammer, bit and drill pipe act as a matched system, while top-hammer tools depend on the correct shank, thread and drilling-machine interface. Wear is influenced by formation, operating practice, flushing, alignment and the selected duty. The tool needs a verified interface and operating envelope before it is fitted to a rig. For the ZD-89 Drilling Tool record, the review should document the actual application, site interfaces and operating sequence before any configuration is confirmed. This working-principle guidance explains general selection context only. Exact capability, limits, materials, test conditions and compatibility remain subject to the approved model record and application review. The buyer should retain the project inputs with the inquiry so the final recommendation can be checked against the intended duty rather than inferred from a catalog label.
Typical Applications
- DTH drilling string planning with confirmed hammer and pipe interface
- Water-well drilling where the bore and tool program are documented
- Quarry drilling after formation and bit-selection review
- Rock-drill tooling replacement with confirmed shank or thread
- Geotechnical or anchoring work subject to tool-string confirmation
- Maintenance planning for documented drilling consumables
Selection Guide
- Tool type and intended drilling method
- Compatible hammer, rock drill, thread or shank
- Required hole diameter and bit configuration
- Drill-pipe connection and string geometry
- Operating pressure, flushing medium and formation
- Wear history, safe handling and replacement plan
Technical Specifications
| Tool type | Configuration subject to application review. |
|---|---|
| Compatible hammer or rock drill | Configuration subject to application review. |
| Bit diameter | Drill pipe length (mm) Thread type Wall thickness |
| Thread | Configuration subject to application review. |
| Shank type | Configuration subject to application review. |
| Working pressure | Configuration subject to application review. |
| Length | Configuration subject to application review. |
| Weight | Configuration subject to application review. |
| Material or carbide grade | Configuration subject to application review. |
Standard Configuration
- Tool identity and interface subject to the approved catalog record
- Connection details checked against the related rig or hammer
- Handling and packaging scope confirmed with the quotation
Optional Configuration
- Compatible bits, hammers, pipes or adapters subject to interface review
- Tooling quantities and replacement planning based on the drilling program
- Protective handling accessories where required by the project
Operation, Maintenance and Safety
- Verify the tool interface before installation
- Inspect threads, shanks, flushing passages and wear surfaces
- Use safe lifting and handling methods for heavy tooling
- Depressurize the drilling system before tool changes
- Remove damaged tools from service according to the approved procedure
- Use only confirmed lubrication and connection practices



